EV Fast Charging Station HITEC City | 24/7 Ultra-Fast Charging Hubs & Guide
HITEC City (Hyderabad Information Technology and Engineering Consultancy City) stands as the technology beating heart of Telangana. As India’s premier IT and corporate district—housing megacities of innovation like Mindspace, Knowledge City, Cyber Towers, and the Financial District corridor—it is also the epicenter of Telangana’s electric mobility revolution.
Driven by the state’s 100% Road Tax and Registration Fee Waiver and the rapid influx of high-range electric four-wheelers, luxury EVs, and commercial EV fleets, access to reliable, high-power EV fast charging stations in HITEC City has become essential urban infrastructure.
This technical guide covers everything about EV fast charging hubs in HITEC City: key locations, electrical engineering specifications, charging tariffs (TGSPDCL), software connectivity, commercial viability, and execution setups.

The Rise of EV Fast Charging Infrastructure in Cyberabad
With over 15% of new passenger vehicle sales in Telangana transitioning to electric, HITEC City sees the highest density of EV usage in South India. IT professionals, corporate fleets, and premium EV owners require rapid energy top-ups during office hours, business meetings, or retail visits.
+-----------------------------------------------------------------+
| HITEC CITY EV FAST CHARGING ECOSYSTEM |
+-----------------------------------------------------------------+
|
+-----------------------------+-----------------------------+
| | |
v v v
+------------------+ +------------------+ +------------------+
| CORPORATE HUBS | | HIGHWAY & ORR | | COMMERCIAL MALLS |
| • Mindspace IT | | • Gachibowli | | • Inorbit Mall |
| • Knowledge City | | Interchange | | • Sarath City |
| • Financial Dist | | • ORR Exit 3 & 4 | | Capital Mall |
+------------------+ +------------------+ +------------------+
| | |
+-----------------------------+-----------------------------+
|
v
+-----------------------------------------------------------------+
| TGSPDCL 11kV/33kV HT GRID SUBSTATION FEEDER |
+-----------------------------------------------------------------+
Why HITEC City Demands High-Power DC Fast Charging:
- High Vehicle Throughput: Thousands of EVs navigate the Cyberabad corridor daily, requiring quick dwell times (20–40 minutes) rather than slow AC overnight charging.
- Corporate & Fleet Demand: Shared mobility fleets (like BluSmart) and corporate employee shuttles require guaranteed uptime and high-power dual-gun DC chargers (60 kW to 240 kW).
- High Density of High-Capacity EVs: Luxury EVs (like BMW iX, Audi e-tron, Porsche Taycan, Mercedes EQS) and popular long-range EVs (Tata Nexon EV, MG ZS EV, BYD Atto 3, Mahindra XUV400) require high-current CCS2 DC Fast Chargers.
Strategic Locations for EV Fast Charging Hubs in HITEC City
Finding a fast charging station in HITEC City depends on proximity to key IT corridors and major transit arterial roads:
+------------------------------------------------------------------------------------+
| KEY EV FAST CHARGING HUBS IN HITEC CITY & NEARBY |
+------------------------------------------------------------------------------------+
| LOCATION HUB | CHARGER TYPES AVAILABLE | BEST FOR |
+--------------------------+---------------------------+-----------------------------+
| Mindspace IT Park | 60kW & 120kW Dual CCS2 | Office hours charging while |
| (Phases 1, 2 & 3) | Fast DC Chargers | working in tech parks. |
+--------------------------+---------------------------+-----------------------------+
| Knowledge City Corridor | 120kW to 240kW Ultra-Fast | Quick top-ups during client |
| (Near T-Hub / Skyview) | DC Charging Hubs | meetings or dining. |
+--------------------------+---------------------------+-----------------------------+
| HITEC City Metro Station | 30kW & 60kW DC Fast | Park-and-Ride commuters and |
| Parking Hub | Chargers + Type-2 AC | ride-hailing EV drivers. |
+--------------------------+---------------------------+-----------------------------+
| Inorbit Mall & | 60kW Dual-Gun DC Fast | Destination charging during |
| Durgam Cheruvu Viewpoint | Chargers | shopping & leisure. |
+--------------------------+---------------------------+-----------------------------+
| Gachibowli - ORR Exit 3 | 120kW to 360kW Megawatt | Intercity highway travelers |
| (Adjacent to HITEC City) | Ultra-Fast Charging Plazas| heading to Rajiv Gandhi Int.|
+------------------------------------------------------------------------------------+
Technical Specifications: EV Fast Charging Architecture
Commercial EV fast charging stations in HITEC City do not run on standard single-phase residential electricity. They are powered by High-Tension (HT) grid hookups connected to TGSPDCL (Southern Power Distribution Company of Telangana Ltd.) sub-transmission lines.
Engineering Components of a 120kW Dual-Gun DC Fast Charger:
- Input Power: 415V Three-Phase AC line from a dedicated step-down transformer (11kV to 415V LT).
- AC-to-DC Rectification: High-efficiency silicon carbide (SiC) power modules converts 3-phase grid AC to direct current (DC) supplied straight to the vehicle’s traction battery.
- Connector Protocol: CCS2 (Combined Charging System Type 2), the mandatory standard for four-wheeler fast charging in India.
- Communications Protocol: OCPP 1.6J / 2.0.1 via 4G/Ethernet connecting to cloud-based Charge Point Management Systems (CMS).
+-----------------------------------------------------------------------+
| 120kW DC FAST CHARGER POWER FLOW DIAGRAM |
+-----------------------------------------------------------------------+
TGSPDCL 11kV Grid
│
▼
[11kV/415V Step-Down Transformer (160 kVA)]
│
▼
[Main LT Panel & Circuit Breakers (MCCB / SPD)]
│
▼
[120kW DC Fast Charger Cabinet (SiC AC-to-DC Converter)]
│
├───────────────────────────┬───────────────────────────┐
▼ ▼ ▼
[Gun 1: CCS2 (60kW)] [Gun 2: CCS2 (60kW)] [Dynamic Power Sharing Module]
(Charges Vehicle A) (Charges Vehicle B) (Allocates 120kW if 1 EV plugs in)

Electricity Tariff & Charging Costs in HITEC City (2026)
Electricity rates for public EV fast charging in Telangana are governed by the Telangana State Electricity Regulatory Commission (TSERC) and distributed by TGSPDCL.
1. Grid Tariff (TGSPDCL LT-IX / HT-IX Tariff Category)
TGSPDCL provides a dedicated EV Charging Station Tariff Category (Category IX):
- Base Energy Charge: $\approx ₹6.00 \text{ per kWh (unit)}$.
- Fixed Demand Charges: Nominal or waived fixed charges per kVA/month to support infrastructure expansion.
2. Consumer Retail Pricing at Fast Charging Stations
Charge Point Operators (CPOs) in HITEC City add operational service fees (land lease in premium Cyberabad areas, equipment depreciation, maintenance, and software licensing):
| Charging Mode | Typical Power Output | Average Billed Consumer Cost (per kWh) | Est. Time for 20% to 80% Charge |
| Public AC Destination | 7.4 kW to 22 kW | ₹9.00 – ₹14.00 per unit | 3 to 6 Hours |
| Standard Fast DC | 30 kW to 60 kW | ₹18.00 – ₹21.00 per unit | 45 to 60 Minutes |
| Ultra-Fast DC | 120 kW to 240 kW | ₹21.00 – ₹25.00 per unit | 18 to 30 Minutes |
Cost Comparison: Charging a 40 kWh EV in HITEC City
Assuming a Tata Nexon EV or MG Windsor EV with a $\approx 40\text{ kWh}$ battery capacity:
- Home AC Rate (Telangana): $40\text{ unit} \times ₹9.50 = \mathbf{₹380}$
- Public Fast DC Rate (HITEC City): $40\text{ unit} \times ₹20.00 = \mathbf{₹800}$
- Equivalent Petrol SUV Cost (300 km range): $\mathbf{₹2,250}$
Public fast charging remains over 60% cheaper per kilometer than petrol, while saving hours of downtime.
How to Setup an EV Fast Charging Station in HITEC City
Setting up a commercial charging hub in Cyberabad requires coordinating electrical engineering, land acquisition, DISCOM grid connections, and software setup.
+---------------------------------------------------------------------------------+
| EV FAST CHARGING STATION EXECUTION STEPS |
+---------------------------------------------------------------------------------+
| STEP 1: Land Leasing / Site Selection (Min 400-600 sq ft near tech parks) |
| STEP 2: Power Sanction & Grid Feasibility Application with TGSPDCL |
| STEP 3: Procurement of CPO Hardware (120kW Dual-Gun CCS2 Chargers) |
| STEP 4: Civil Works (Concrete Pads, Trenching, Canopy, Fire Safety) |
| STEP 5: Substation & Electrical Panel Setup (11kV HT Breaker + Transformer) |
| STEP 6: CEIG (Chief Electrical Inspectorate) Inspection & Safety Certification |
| STEP 7: CMS Cloud Onboarding, Payment Gateway Setup & Commercial Launch |
+---------------------------------------------------------------------------------+

15 Frequently Asked Questions (FAQs)
Q1: Where can I find 24/7 EV fast charging stations in HITEC City?
Answer: Major 24/7 fast charging hubs in HITEC City are located at Mindspace IT Park, Knowledge City (near Skyview and T-Hub), Sarath City Capital Mall parking, HITEC City Metro Station park-and-ride lot, and along the Gachibowli-ORR junction. Most locations offer illuminated, secured access with dual-gun CCS2 DC fast chargers.
Q2: How fast can a 120kW DC charger charge my electric car in HITEC City?
Answer: A 120kW DC fast charger can charge a standard electric four-wheeler (such as a Tata Nexon EV, MG ZS EV, or Hyundai IONIQ 5) from 20% to 80% in approximately 18 to 28 minutes, depending on the vehicle’s maximum DC charging intake rate and battery management system (BMS) thermal state.
Q3: What is the cost per unit (kWh) for fast DC charging in HITEC City?
Answer: Public DC fast charging in HITEC City generally costs between ₹18.00 and ₹24.00 per kWh (plus applicable GST). Pricing varies slightly depending on whether you use a 30kW, 60kW, or 120kW+ charger and the specific Charge Point Operator (CPO) network (e.g., Static, Zeon, Tata Power EZ Charge, Bolt.Earth, ChargeZone).
Q4: Which charging connector standard is used at HITEC City fast charging stations?
Answer: Public DC fast chargers in HITEC City primarily use the CCS2 (Combined Charging System 2) standard, which is compatible with almost all 4-wheeler EVs sold in India. Some older fleet setups may also feature GB/T or CHAdeMO connectors, while AC stations feature Type-2 connectors.
Q5: Can I charge my EV at HITEC City tech parks if I am a visitor?
Answer: Yes. Most major tech parks across Cyberabad—including Mindspace, Knowledge City, and Cyber Gateway—allow visitor EV charging. You can access the chargers via the respective CPO’s mobile app or by scanning a QR code at the charging bay.
Q6: How do I pay for charging at an EV station in HITEC City?
Answer: Charging sessions are initiated and paid for using mobile applications provided by CPO networks (such as Tata Power EZ Charge, Kazam, ChargeZone, or Zeon Charging) or universal aggregator apps. Payment methods include UPI, credit/debit cards, net banking, RFID charging cards, and in-app wallet balances.
Q7: Are there slow AC chargers available alongside DC fast chargers in HITEC City?
Answer: Yes. Most commercial EV hubs install a mix of 7.4kW to 22kW Type-2 AC chargers alongside high-power DC fast chargers. AC chargers are ideal for professionals parking their vehicles for 4 to 8 hours during office shifts.
Q8: What grid electricity tariff applies to commercial EV stations in Cyberabad?
Answer: TGSPDCL applies the Category LT-IX / HT-IX EV Charging Station Tariff, which offers a base energy rate of around ₹6.00 per kWh. This promotional tariff is designed by the Telangana state government to encourage the development of public charging infrastructure.
Q9: Do luxury EVs like Porsche, BMW, Audi, and Mercedes support fast charging in HITEC City?
Answer: Yes. Luxury EVs feature high-voltage battery architectures that support DC fast charging rates from 150 kW up to 350 kW. Plugs at 120kW and 240kW ultra-fast DC hubs in HITEC City and Knowledge City use standard CCS2 guns that work natively with luxury electric vehicles.
Q10: How do I find available charging slots in real time in HITEC City?
Answer: You can check real-time charger availability, connector status (Available, Occupied, or Out of Service), and power output ratings using EV navigation platforms like Google Maps, PlugShare, or dedicated CPO apps.
Q11: Is CEIG safety approval mandatory to set up an EV charging station in HITEC City?
Answer: Yes. If your EV fast charging station requires a High-Tension (HT) grid connection (11kV/33kV) or has a cumulative capacity exceeding 50 kW, obtaining a safety clearance certificate from the Chief Electrical Inspectorate to Government (CEIG) Telangana is mandatory before energization.
Q12: How much space is needed to install a 2-bay DC fast charging station in HITEC City?
Answer: A typical dual-bay DC fast charging station requires 400 to 600 sq. ft. of clear space. This covers two dedicated parking bays, the DC charger power cabinet, LT/HT breaker panels, safety bollards, and fire safety equipment.
Q13: Are there subsidies available for setting up EV chargers in Telangana?
Answer: Telangana’s EV Policy emphasizes zero road tax/registration fee exemptions for EV buyers while offering concessional electricity tariffs (LT-IX/HT-IX) and streamlined DISCOM load sanctioning for station operators. Land allocations under public-private partnerships (PPP) are coordinated through TGREDCO.
Q14: What happens if a fast charger stops during my charging session?
Answer: Most fast chargers feature automated self-diagnostics. If power trips due to grid fluctuation or thermal limits, the session stops safely, and the charger unlocks the gun. Customer support contact details and emergency stop buttons are clearly displayed on every commercial DC charger.
Q15: What is the ROI timeline for an EV fast charging hub in HITEC City?
Answer: Due to high vehicle density and continuous utilization from IT professionals, corporate fleets, and ride-hailing EVs in Cyberabad, a well-located DC fast charging hub in HITEC City typically achieves capital payback (ROI) within 2.5 to 4 years.